Project:

150 kV Station and Substation Zuidbroek at Apeldoorn Netherlands

Completion:

March 2015

Client:               

Reddyn B.V. Duiven

Main Contractor:

Aannemingsmaatschappij
Hegeman B.V.
Nijverdal

Roofing Contractor:

Manning Dakbedekking
Musselkanaal

Roof Build-up:

Roof Tennet and Liander
Substrate: Concrete 250 mm
Vapour barrier: Polyethylene membrane
Insulation: DAWO EPS 100 flat
                   DAWO EPS 100 grade
First layer: BIIG® 460P60 premium PPL
Top layer: BIIG® REGULAR 446K14
Area: 534 m2

Inspection:

Dam Dak Advies
Sneek

Warranty:

10 year all-inclusive insured warranty covered by Allianz Nederland Corporate.

Result:

Why choose Manning Roofing for BIIG® REGULAR 446K14?
● Excellent price / performance ratio.
● Expected life > 30 years.
● Project includes a comprehensive insurance product warranty.
● Technical support from the manufacturer and supplier.

Go to top

Copyright 2016 IIGO.EU All rights reserved.